Training, Documentation and Process Control: Turning Training into Lasting Operational Improvements

A successful training seminar can create strong momentum across a tube, pipe, or roll forming operation. Operators, maintenance personnel, engineers, and managers may leave with new ideas and a better understanding of what needs to improve. The challenge is turning that momentum into long-term results.

The key is participation and accountability. Everyone involved in the operation has a role in the mill’s success, and everyone should be part of the improvement process after training.

Start by holding a follow-up meeting to review what was learned. Identify the wants, needs, and concerns that came out of the seminar, then prioritize them. From there, develop a corrective action plan with a realistic timetable.

Standard operating procedures should also be reviewed. If SOPs already exist, update them based on what was learned. If they do not exist, this is a good time to establish them.

Once standards are set, everyone should be held accountable to the same process. The goal is to eliminate different methods between shifts or individuals and replace them with one proven way of doing the work.
 

What to Put Into Practice

  • Conduct follow-up meetings.
  • Prioritize improvement opportunities.
  • Develop corrective action plans.
  • Establish or update SOPs.
  • Hold personnel accountable.
  • Standardize best practices.

Watch our video below for a full demonstration:

Have questions about your tube mill setup process or need help troubleshooting a production issue? Roll-Kraft provides tube and pipe tooling design, technical support, setup assistance, and project quoting support for manufacturers worldwide. Visit our Contact Us page to speak with our team about your application, tooling requirements, or production challenges.

Related Articles
Profit Pointer Pipe and Tube Production

All too often, production problems are the result of incorrect tooling and mill setup, as well as poor maintenance practices.

Read More
Solving Pipe & Tube Production Problems

All too often, though, these problems are the result of incorrect tooling and mill setup, as well as poor maintenance practices.

Read More
Profit Pointer Roll Forming Materials

High-strength materials have many advantages over general strength, or standard, materials and are widely used for structural components in various industries.

Read More
Profit Pointer for Tooling Management

A properly employed Tooling Management and maintenance Program will go a long way toward improving your overall performance.

Read More
Profit Pointer for Tube Mill Alignment

This article covers the important areas on the mill so as to insure proper alignment and therefore high quality tubing, as well as longer life out of the tooling.

Read More
Profit Pointer for Changeover Times

Reducing tooling and equipment changeover times is critical to operating a cost-effective tube or pipe mill.

Read More

Time to Roll Profits!

Have a technical question?

Need a quote from one of our performance specialists?

Simply contact us here or call and get answers 24/7.

Contact Us (888) 953-9400

Roll-Kraft Names Mike Samplak as Plant Manager

Roll-Kraft is pleased to announce the appointment of Mr. Mike Samplak to the position of Plant Manager at its headquarters facility in Mentor, OH.

➤ Read More

Roll-Kraft names Frank Lowery as Vice President of Roll Form Applications

Roll-Kraft is pleased to announce the appointment of Frank Lowery to Vice President of Roll Form Applications.

➤ Read More

Kevin Gehrisch Becomes President of Roll-Kraft Companies

Roll-Kraft is pleased to announce the appointment of Kevin Gehrisch to the position of President.

➤ Read More